Engineer Sean Flannigan and his team have been working with Taylor Wimpey PLC and Bloor Homes since 2020 on this outstanding residential development in Warwick.
It is a mixed development that includes 900 dwellings, two commercial areas, a school and also a park & ride. The site is split with Taylor Wimpey Midlands constructing 450 dwellings and Bloor Homes constructing a further 450.
JPP’s instruction for the site back in 2020 included preliminary engineering drainage and levels strategy, detailed planning support, road and sewers drawing packs, detailed levels and drainage designs and foundations designs for the full 900 dwellings.
Since our instruction, we have worked to help secure planning approval for the main infrastructure phase of the development, phase 1 parcels and also future phase 2 parcels for our clients. We have worked to secure Section 38 and Section 104 technical approvals for the on-site roads and drainage as well as the Phase 1 works.
Construction work is progressing well for the infrastructure roads and Phase 1 parcels. A large majority of the infrastructure road has been constructed up to the base course as well as completion of the ponds/swales to enable connection of the phase 1 plots that are completed to date.
Following completion of the Infrastructure and Phase 1 works, JPP look forward to progressing the Phase 2 detailed design works for another approx. 450 plots for our clients Taylor Wimpey plc and Bloor Homes now that planning approval is granted.
JPP is a dynamic, modern, multi-discipline construction consultancy.