The Asps, Warwick is a mixed development that includes 900 dwellings, two commercial areas, a school and also a park & ride. The site is split with Taylor Wimpey Midlands constructing 450 dwellings and Bloor Homes constructing a further 450 dwellings.
JPP’s instruction for the site back in 2020 included preliminary engineering drainage and levels strategy, detailed planning support, road and sewers drawing packs, detailed levels and drainage designs and foundations designs for the full 900 dwellings.
Since our instruction, we have worked to help secure planning approval for the main infrastructure of the development as well as the separate phases for both Taylor Wimpey and Bloor Homes. We are currently working to secure Section 38 and Section 104 technical approvals for the on-site roads and drainage and we have also have carried out the plot parcel designs for our clients with the help of Luke Palmer and his team completing foundations.
Construction work has since started on the main spine road through the site at the Southern Banbury Road site access. The first section of the road has been constructed up to the base course and the large pond/swale running along the far site boundary has been excavated.
Browse the project images by clicking through the gallery below -
JPP is a dynamic, modern, multi-discipline construction consultancy.