JPP Geotechnical and Environmental were appointed by our client to undertake a strategic ground investigation on a 43ha site at Grange Park, Northamptonshire. The proposed development comprised approximately 900 residential properties with private gardens, areas of open landscaping and associated infrastructure.

The site had significant archaeological interest and comprised existing agricultural land which was still in active use. Pre start meetings were held with the land owners, developers and archaeologists to agree a scope of works which met the requirements of all stakeholders involved, minimising damage to the fields and reducing potential impact to archaeological remains.

Following the agreed scope of works, JPP undertook trial pitting on a 50m grid, which were accurately set out on site by our in-house surveying team. The ground investigation encountered variable soils as expected following our desk study assessment of the site, which identified highly variable superficial and bedrock geologies and the presence of fault lines across the site.

In addition to the trial pitting, a range of insitu testing including TRL DCP’s and full scale BRE365 test were undertaken to support the design of the development.

On completion of the fieldwork and production of a site-specific ground model, geotechnical and contamination testing and assessment was undertaken across the site to provide foundation design parameters along with an assessment of the contaminative impacts of the historical land use on the soils encountered on site.

JPP provided preliminary recommendations for the site wide foundation design solutions, floor slab design, concrete classification and on the use of soakaways for infiltration. In addition, contamination assessment and waste classification works were undertaken, enabling JPP to provide our client with remedial design recommendations and a waste classification for the soils which require removal off site.

Our interpretative report provided the land agent with sufficient and detailed information to support pre-application works and to provide to prospective developers interested in acquiring the site with a recommended scope of works for the next stage of detailed design.



Gallery

JPP Consulting

Browse the project images by clicking through the gallery below -



News Feed
Cover for JPP
220
JPP

JPP

JPP is a dynamic, modern, multi-discipline construction consultancy.

4 days ago

JPP
Tim Butler from Peikko UK Ltd presented a CPD at our head office at Grand Union Works on DELTABEAM® slim floor systems. Tim explained how the system can lower embodied carbon and achieve substantial savings with lower buildings. It allows a thinner floor, longer spans, a reduction in vertical materials, foundations, columns, and wall supports, omits fire boarding, and saves time onsite.Thanks to Peikko UK Ltd for such an informative presentation.#cpd #ProfessionalDevelopment #alwayslearning ... See MoreSee Less
View on Facebook

6 days ago

JPP
Congratulations to Joe, Oliver, Ellis and Dan (not pictured) on another year at JPP!Thank you for all of your hard work. We really appreciate all you do. #WorkAnniversary #thankyou #TeamJPP ... See MoreSee Less
View on Facebook
Contact Us   FacebookTwitterLinkedIn Grand Union Works
Whilton Locks
Daventry
Northamptonshire
NN11 2NH
Phone: 01604 781811
Email: Click to email

Unit B2A, Denbigh Business Centre
23 First Avenue
Denbigh, Milton Keynes
MK1 1DN
Phone: 01908 889433
Email: Click to email

Suite 8, Branksome Park House
Branksome Business Park
Bourne Valley Road
Poole, Dorset
BH12 1ED
Phone: 01202 540888
Email: Click to email