JPP were originally appointed by Bellway Homes South Midlands to carry out the preliminary engineering designs to gauge the feasibility and cost implications of the proposed 140 unit residential development at Staverton Lodge in Daventry by setting the levels and drainage strategies and highlighting any constraints to the client prior to their purchase of the site.
After a successful and extensive preliminary works stage, JPP were appointed to progress their works onto the full detailed civil engineering design for the road and sewers accompanied by a full private drainage and external levels design.
JPP have carried out the following works:
– Section 104 Pack
– Section 38 Pack
– Section 278 Pack
– Section 106 Application
– Detailed Cut & Fill
– Private External Levels Design
– Private Drainage Design
Browse the project images by clicking through the gallery below -
JPP is a dynamic, modern, multi-discipline construction consultancy.