Engineer, Joe Winter recently took a visit to conduct an as-built survey on a scheme that he, along with Senior Engineer Harry Smith as part of JPP Highways, completed design works on December 2021.
The works consisted of a priority junction to serve a commercial development in Bicester, Oxfordshire with an LTN1/20 (great read) compliant cycle crossing and associated segregated cycle/footway. The works have been completed to a high standard and its great to see projects come to completion and see how our designs contribute to the real world highway network.
Fantastic work from the JPP Highways team who consistently deliver professional highway design and consultancy services for βoff-siteβ highway infrastructure schemes associated with residential and commercial developments.
JPP is a dynamic, modern, multi-discipline construction consultancy.